|

PIERS has sucessfully uncovered and removed over 500 Underground
Storage Tank (UST) systems throughout California. PIERS UST removal
projects have involved tanks ranging in size from 500 gallons to
12,000 gallons containing hydrocarbons and/or solvents.
From residential heating oil tanks to multiple tanks at gas stations,
PIERS has experience and is well equipped to complete these sophisticated
projects. Our company has an excellent reputation in offering effective
regulatory agency permitting, tank disposal, hazardous waste manifesting,
backfill operations, soil removal and site restoration, the engineering
of plans, and completing the actual physical removal of UST systems
in record time.
PIERS has over 10 years of experience in new UST and AST installations
as well as with UST system upgrades to meet new regulations. PIERS
streamline project procedures include: assisting the client in obtaining
the lowest prices for USTs and related system equipment; development
of engineered fuel system plans, submittal of applications to local
fire, building and environmental health agencies as well as air
quality control and storm water pollution prevention districts.
PIERS is also experienced in performing required annual monitoring,
system inspections, fuel system trouble shooting and repairs, upgrades
and maintenance. PIERS has become a leader in the Underground Storage
Tank System Removal, Upgrade and Installation market in California
and is proud to be one of the most cost effective and time efficient
companies available offering these specialized engineering services.
|